
Deck Building
Our expert deck building service transforms your outdoor space into a beautiful, functional area for relaxation and entertainment
Price starts at $7,000
BrowseWe build custom decks in Mill Creek β composite, cedar, pressure-treated, and everything in between. Whether itβs a raised deck, walk-out, or a covered space for year-round use, we handle layout, permitting, framing, and finish work. We work with top brands like Trex, TimberTech, and AZEK for composite installs, and use tight-knot cedar or pressure-treated lumber for wood builds. Every deck gets set on proper footings, with Simpson hardware, code-compliant railings, and the right slope for drainage. Need stairs? Wrap-around skirting? Hidden fasteners or lighting? Weβve got you covered. All materials are picked up locally β no delays, no cheap box-store stock. If your old deck is rotted or failing, we tear it out and rebuild it right. Clean lines, strong framing, built to last in the Pacific Northwest weather βπ§±π.
We build structural, code-compliant decks in Mill Creek β composite, cedar, or pressure-treated. Every deck is designed for durability, drainage, and Northwest weather. From layout to final inspection, we handle the whole job.
We also remove old decks, repair rot, and handle all permits through the City of Mill Creek. Youβll get a clear scope and timeline before we start.
We build it once β frame it right, fasten it properly, and leave you with a solid, code-approved deck thatβs ready for years of use. β
Use our AI-powered remodel cost calculator to estimate project costs in Seattle. Enter your project details and instantly receive an estimated budget for your remodel.
Service | Cost Range | Average Cost | Labor Cost | Material Cost |
---|---|---|---|---|
Deck Material | $3,312 - $5,606 | $4,459 | $3,312 | $1,147 |
Deck Installation | $6,152 - $10,410 | $8,281 | $6,152 | $2,129 |
Weβve turned 3 basements into cozy and useful spots this year. Whether it's a game room, office, or extra bedroom, see how basements can be transformed!
Area:
basement
Timeline:
3 to 6 weeks
Weβve built and revamped decks for relaxing, entertaining, and enjoying the outdoors. Check out some of our recent deck projects and get ready to enjoy your outdoor space!
Area:
deck
Timeline:
1 to 2 weeks
$1,500 - $85,000
$18,000
NaN%
$25,000 - $150,000
$0
β
We donβt just lay decking β we build structural outdoor spaces that hold up over time and meet code. Every deck in Mill Creek starts with planning, permits, and real layout prep. Whether youβre going with composite, PVC, or natural cedar, the structure underneath is what makes it last β and thatβs where we focus first.
We begin with a walk-through to check site access, slope, drainage, and existing conditions. From there, we design the layout based on use β raised deck, walk-out, stairs, railing height, or future hot tub loads. Before anything is built, we pull permits through the City of Mill Creek and follow IRC 2021 guidelines for framing spans, railing height (36" or 42"), tread depth, and post footing sizes.
Framing is done with pressure-treated lumber, usually 2x8 or 2x10 joists spaced 16" OC. We install butyl joist tape on every framing member before decking β it protects the wood from moisture intrusion, prevents rot, and extends the life of both wood and fasteners. Hardware includes Simpson Strong-Tie post bases, brackets, and structural screws β not drywall screws or nails.
Every board is installed with proper gapping, hidden fasteners (CAMO, Trex Universal, or Cortex plugs), and clean trim details around edges, stairs, and posts.
Stairs are framed to code β minimum 10" tread depth, max 7ΒΎ" riser, and solid blocking. Railings are installed with 4x4 post anchoring and tension-tested if using cable or horizontal steel systems.
We finish every build with a full walk-through, cleanup, and inspection sign-off. No loose trim, no wobbly rails, no missing fasteners. Just a solid, clean deck built to code and ready for long-term use in Mill Creek weather. β
We build decks in Mill Creek that meet code, hold up through wet winters, and are framed tight from the ground up. Whether youβre after a small walkout or a large composite deck with stairs and lighting β we handle the whole thing, start to finish.
Need help picking out material in person? You can visit Parr Lumber β Mill Creek:
π 12310 19th Ave SE, Everett, WA 98208 β just off SR-527
They stock cedar, composite decking, railing systems, fasteners, and framing hardware.
We still handle all material ordering and delivery β you never have to source anything yourself. You get one crew, one contract, and a deck thatβs framed, flashed, and finished the right way. β π§°π¦